Friday, April 14, 2017

Under-bed storage / rear flooring

The rear flooring need some attention as the plywood the edges were damaged from water seeping past worn rear tail light seals. The minor oxidation to the bodywork under the ply edges was cleaned, neutralised, primed and painted. 12mm marine ply was sourced and replaced the damaged floor section.
The floor area from the rear wheel arches back which will be the queen bed/storage area was finished with 300 x 300 cork floor tiles due to their light weight and their excellent sound/thermal insulating properties.



















Sunday, March 26, 2017

Solar

A set of 4 x 150W Monocrystalline Solar panels were sourced.
A custom alloy rack was designed, fabricated and powder coated to permanently mount them in pairs either side of the central vent.










Sunday, March 12, 2017

Shock absorbers

A replacement set of shock absorbers was sourced to replace the squeaky old OEM ones.
A set of Powerdown aftermarket shocks with rear adjustability were chosen and fitted.






Plumbing

A selection of 12mm John Guest fittings and semi rigid pipe have been used throughout for pressure cold and hot water supply lines.
25mm barbed fittings and reinforced hose has been used for rey water waste from the shower (x3), bathroom basin and kitchen sink through a pair of HepVo one way valves and back to the grey water tank.