Sunday, March 26, 2017

Solar

A set of 4 x 150W Monocrystalline Solar panels were sourced.
A custom alloy rack was designed, fabricated and powder coated to permanently mount them in pairs either side of the central vent.










Sunday, March 12, 2017

Shock absorbers

A replacement set of shock absorbers was sourced to replace the squeaky old OEM ones.
A set of Powerdown aftermarket shocks with rear adjustability were chosen and fitted.






Plumbing

A selection of 12mm John Guest fittings and semi rigid pipe have been used throughout for pressure cold and hot water supply lines.
25mm barbed fittings and reinforced hose has been used for rey water waste from the shower (x3), bathroom basin and kitchen sink through a pair of HepVo one way valves and back to the grey water tank.



































Friday, March 10, 2017

Steering

A SAAS Steering wheel and A HKB Sports OT-600 boss kit was ordered from Japan and fitted in place of the OEM steering wheel.